
Wire Ring Conveyor Belt
Wire ring/eyelink conveyor belt family with R2 designation structure and listed nominal weights for open-area food processing and transfer systems.
Wire Ring Conveyor Belt
Wire ring belts, also described by the series specification as R2 wire ring belt configurations, use repeated eyelink elements connected by transverse rods. Their designation separates eyelink pitch, rod pitch, rod diameter and eyelink diameter. This makes the designation especially useful for replacement work because a belt can look similar in a photograph while using a different rod or eye diameter. The specification table lists a broad set of nominal-size combinations and weights, which should be preserved exactly when comparing candidates.
For replacement work, treat the belt mesh, cross rods, edges, supports and drive as one interface. The part should be compared with the conveyor that exists today, including any guide, carrier or sprocket modifications made after the original machine was commissioned.

Prüfen Sie die Merkmale, die Passform und Bewegungsfreiheit steuern.

The key review points are product support, tracking, transfers and drive engagement. Measure several repeating features where possible instead of relying on one worn joint, rod or attachment. Photograph the component while it is still installed so running direction, guide contact and drive engagement are visible.
Begin with the four designation values, then record belt width, edge treatment, support-wire arrangement and drive method. Product support is governed by the opening pattern as well as the wire diameter, so include the smallest product or tray footprint. For washing, cooling and drying lines, document drainage or airflow requirements. If the belt is expected to run around small transfer diameters, provide those diameters rather than assuming that any R2 configuration will articulate identically.
Sind die Maße unsicher, sollten sie als an einem verschlissenen Muster gemessen angegeben und nicht auf einen angenommenen Sollwert gerundet werden. Dies erleichtert die Unterscheidung zwischen einem tatsächlichen Maßfehler und normalem Verschleiß im Rahmen der technischen Prüfung.
Technische Zeichnung und Spezifikation

Dimension key: R2 designation: 1 = eyelink pitch; 2 = rod pitch; 3 = rod diameter; 4 = eyelink diameter.
| Designation | Weight (kg/m²) |
|---|---|
| R2-6-63.5-13.8-3.0 | 17.59 |
| R2-5.2-63.5-12.0-2.6 | 22.61 |
| R2-4.6-50.8-8.0-2.3 | 23.89 |
| R2-4.0-50.8-10.0-2.0 | 16.96 |
| R2-3.2-50.8-8.0-1.6 | 24.17 |
| R2-5.2-50-6.0-2.6 | 12.16 |
| R2-4-50-6.0-2.0 | 18.0 |
| R2-5.2-50-5.0-2.6 | 18.8 |
| R2-5.2-38.1-7.0-2.6 | 29.2 |
| R2-4-38.1-8.0-2.0 | 26.9 |
| R2-3.2-38.1-6.0-1.6 | 17.4 |
| R2-2.4-38.1-8.0-1.2 | 18.3 |
| R2-4-31.75-7.0-2.0 | 27.7 |
| R2-4-31.75-5.0-1.2 | 13.2 |
| R2-2.4-25.4-6.0-2.0 | 25.5 |
| R2-2.4-25.4-5.0-1.2 | 15.6 |
| R2-4-25.0-5.0-2.0 | 22.2 |
Die Tabelle gibt die verfügbaren Modell-/Konfigurationsdaten für diese Produktseite wieder. Nicht aufgeführte Werte sollten anhand der Projektzeichnung, der aktuellen Komponentenschnittstelle oder der Maschinenschnittstelle überprüft und nicht aus einer anderen Serie abgeleitet werden.

Bewerten Sie die Komponente innerhalb des gesamten Förderwegs
Wire Ring Conveyor Belt is considered for food-processing, cooling, washing and transfer equipment. In addition to the component dimensions, state the product being conveyed, spacing, line speed, starts and stops, curve or incline conditions, process zones and sanitation method. These operating inputs help identify the interfaces that deserve extra attention during approval.
Prüfen Sie Antrieb, Lagerungen, Übergabepunkte und Rücklauf auf Verschleiß oder Beschädigungen. Tritt der Schaden wiederholt an einer bestimmten Maschinenposition auf, beheben Sie die Beschädigung an dieser Stelle, bevor Sie über den Austausch von Kette oder Riemen entscheiden. Ein Ersatzteil kann Grate, falsch ausgerichtete Führungen, beschädigte Kettenräder oder nicht ausreichend gelagerte Übergabepunkte nicht kompensieren.
Kommissionierung bei niedriger Drehzahl vor normaler Produktion
A wire ring belt should enter and leave the drive without pulling individual eyes sideways. Check that cross rods remain square and that edge guidance is symmetrical. During commissioning, observe the belt at return rollers and transfer points as well as on the carry run. A skewed rod can repeat once per belt revolution and may be easier to diagnose by marking the suspected row and watching it through the loop.
Vergleichen Sie nach dem ersten Leerlauf dieselben Messpunkte unter repräsentativer Last. Dokumentieren Sie jegliche Änderungen der seitlichen Position, der Gelenkigkeit, der Übertragungsstöße, der Geräuschentwicklung oder der Spannposition. Ein kurzes, reproduzierbares Inbetriebnahmeprotokoll erleichtert die Unterscheidung zwischen normalem Einlaufen und einem Problem mit der Maschinenschnittstelle, das vor der Serienproduktion behoben werden muss.
Vor dem Einbau des neuen Bauteils müssen Kettenräder, Führungen, Stützen und Übertragungselemente gereinigt und geprüft werden.
Prüfen Sie Laufrichtung, seitliche Position und Eingriff, ohne das Bauteil in die Führungsschiene zu drücken.
Folgen Sie einer markierten Verbindungsstelle oder Riemenreihe mit der niedrigstmöglichen Geschwindigkeit durch den gesamten Kreislauf.
Führen Sie repräsentative Belastungen ein und überprüfen Sie das Übertragungs-, Kurven-, Tracking- und Rückwegverhalten erneut.
Die Tragefläche und die Gelenkpunkte müssen gut sichtbar sein.
Open-eye structures are easy to see through but can trap fibers or food particles around rod intersections. Cleaning should flush these zones without deforming the eyes. Inspect wire surfaces for flattening, cracks near formed radii, rod-end movement and unequal eye spacing. If a support wire is used, verify its pattern and diameter during replacement because that feature changes both product support and local stiffness.
Dokumentieren Sie jeglichen wiederkehrenden Kantenverschleiß, Kontakt mit polierten Führungen, verformte Befestigungen, Stiftbewegungen, Hakenfehlausrichtungen oder Siebverzerrungen. Ein datiertes Foto von denselben Prüfpunkten erleichtert das Erkennen von Trendänderungen im Vergleich zu einer isolierten Endabnahmeprüfung.
Die für Nachbestellungen relevanten Maße und Prüfungen festlegen
After the first acceptable sample or production batch is confirmed, retain the model/designation, current dimension record, approved photographs and the machine position where the component is used. For Wire Ring Conveyor Belt, include the features that control product support, tracking, transfers and drive engagement. If the conveyor is modified later, update the interface record instead of assuming the historical part number still describes the machine.
Bei einer neuen Anfrage führen Sie bitte jedes Modell als separate technische Linie, auch wenn mehrere Modelle kommerziell kombiniert werden. Geben Sie die Muster- und Produktionsmenge separat an. Falls ein bestimmtes Material, eine Oberflächenbeschaffenheit oder ein spezielles Verfahren zwingend erforderlich ist, kennzeichnen Sie dies bitte als Anforderung, damit es mit den Mindestprozessvorgaben verglichen werden kann.
Zu klärende Fragen vor Produktionsfreigabe
Confirm belt mesh, cross rods, edges, supports and drive against the current machine. Record where the part is supported, guided and driven, and identify any feature that has been repaired or modified.
Describe product footprint, spacing, orientation and transfer points for food-processing, cooling, washing and transfer equipment. Note curves, inclines or hanging sections that change the clearance requirement.
Photograph recurring wear and identify the machine position where it occurs. Check product support, tracking, transfers and drive engagement before deciding that the old component itself caused the problem.
Wählen Sie für die Wareneingangsprüfung Maße, die sich konsistent messen lassen, und vergleichen Sie diese mit der Zeichnung oder dem freigegebenen Muster. Verwenden Sie nicht allein das Aussehen als Abnahmekriterium, wenn zwei Ausführungen eine ähnliche Gesamtform aufweisen. Dokumentieren Sie für die Inbetriebnahme das Ergebnis des Niedriggeschwindigkeitstests vor dem regulären Produktionsbetrieb, um späteren Wartungsarbeiten einen Vergleichswert zu liefern.
Bei Nachbestellungen geben Sie bitte an, ob sich die Maschine, das Produktformat oder der Reinigungsprozess seit der letzten Charge geändert haben. Selbst geringfügige Änderungen an Führungen, Übergabevorrichtungen oder Produktabständen können die für die Leistung zuständige Schnittstelle beeinflussen, selbst wenn das nominale Komponentenmodell unverändert bleibt.
Confirm Wire Ring Conveyor Belt against the current conveyor before production quantity
A dimensional table identifies the listed product, but replacement approval should also compare the wire mesh, rods, edges, supports and drive with the machine that will receive the part. For Wire Ring Conveyor Belt, record belt width, repeating geometry, edge guidance and transfer support using the same datums that will be used for incoming inspection. If an old component is worn, measure several repeats and photograph the least-damaged reference area rather than selecting one convenient value.
Die Fotos sollten mehr als nur das lose Bauteil zeigen. Sie sollten den Antriebs- und Rücklaufweg, beide Förderbandkanten, die engste Übergangsstelle und alle Stellen mit wiederkehrendem Verschleiß zeigen. Fügen Sie eine Gesamtansicht der Maschine hinzu, damit Laufrichtung und Produktweg eindeutig erkennbar sind. Wenn eine Führung, ein Kettenrad, eine Stütze oder ein Übergabeelement repariert wurde, vermerken Sie diese Änderung, da die vorhandene Schnittstelle diejenige ist, zu der das Ersatzteil passen muss.
Für die Musterfreigabe müssen die kritischen Abmessungen und die sichtbare Konfiguration vor der Musterfertigung festgelegt werden. Bei Tests mit niedriger Drehzahl ist ein markiertes Gelenk, ein Träger oder eine Bandreihe über eine vollständige Umdrehung zu verfolgen. Dabei sind jegliches Schleifen, Abheben, Schräglauf, zyklische Geräusche oder Produktpositionsänderungen zu dokumentieren. Tritt das Problem an einer festen Position der Maschine auf, sind die umliegenden Bauteile zu überprüfen, bevor die Komponentenspezifikation geändert wird.
Bei Nachbestellungen sollten das bestätigte Modell, die Maßangaben und die Maschinenposition zusammen gespeichert werden. Dies reduziert Unklarheiten, wenn in derselben Anlage ähnliche Komponenten auf mehreren Linien verwendet werden. Ändert sich das Produktformat, das Linienlayout oder der Reinigungsprozess, geben Sie diese Änderung in der nächsten Anfrage an, auch wenn die Komponentenbezeichnung unverändert bleibt.
Wire Ring Conveyor Belt FAQ
What do the four R2 designation numbers represent?
They identify eyelink pitch, rod pitch, rod diameter and eyelink diameter in that order.
Why are there many R2 combinations?
Different pitch and wire combinations change opening size, support, belt weight and articulation, so the existing designation should be matched carefully.
What is the role of support wire?
Support wire can reduce the effective opening and improve product support; its presence and arrangement should be documented in the RFQ.
Can nominal weight be used to identify a belt?
It can be a cross-check, but geometry and measured dimensions remain more reliable for replacement identification.
What should be inspected first on a worn belt?
Look at cross-rod alignment, eye deformation, edge wear and recurring damage at the drive or transfer points.
Vor der Produktionsfreigabe messbare Merkmale prüfen.
Verwenden Sie reproduzierbare Maße und aktuelle Fotos der Maschine für die Wareneingangskontrolle und die Freigabe von Ersatzteilen.


Berücksichtigen Sie bei Austausch- oder Nachrüstungsprojekten den aktuellen Förderbandweg und die Betriebsbedingungen.